ILC

Countdown Begins

We have 3 more days until East Coast Paint Supply/ILC’s big sale.

flyer

On top of this big day coming up we also only have 8 more days until our cross country sticker mission.  And just to refresh your memory from the last blog, our goal is to have a plane in Boston give us a ride out to L.A. so that we can pick up our boy JK Steelz and drive back to CT getting as many ILC stickers up as possible. I mean, we figure we need a street team to really get the ILC name out there so what would be better than if the cast of ILC got their own hands dirty for this first promotion adventure.

Well in any event, with all this stuff about to happen right around the corner, imagine all the preparation that needs to get done. Stickers need to get made, our new tees need to get produced, traveling arrangements need to be made and most importantly we need to straighten out the paint situation.

So what do I do? The total opposite of the all the responsibilities. I spent the whole weekend in Mass. getting tattooed, lounging around drinking beer and dropping pieces.

Tatt_sketch

Tatt_midway

Tatt_done

After getting branded by my boy Nest, we made our way over to Task’s house for some lunch…

Lunch

…..mid-day cocktails and some strategic graff planning.

Table

$1can

Ebis

By the time the sun left us for the day we had made our way out to Faze’s house for some more drinks and fun before painting the next day.

Petie

Faze_outlines

Faze_outlines2

Everyone should have one of these signs in their bathroom.

Pee_sign

After a long night of O.E. 40oz’s and Domino’s pizza, we had a light breakfast and then headed out for a full day of painting.

Breakfast

Sticker

Faze_mass

revenge

Ebis

Big_Cas

Then this cat stopped by to snoop around. Sorry buddy, we have codes to, and playing dumb is one of the first.

Cop

task

Cas_barn

Lax_barn

So that’s how I spent my weekend. Maybe this week I’ll be a little more responsible, or I may get kicked off the ILC crew.